380 kV Power line in Styria Previous Next
Client:
Verbund-Austrian Power Grid AG
Location:
Styria and Burgenland
Time period:
2003 - 2009
Project:
Drafting of the technical contributions on geology and groundwater for the EIA procedure concerning the 380kV power line in Styria; construction support and groundwater monitoring.
Services:
- Development of an EIA plan and method
- Surveys and recordings
- Geological and hydrogeological corridor mapping
- Impact analysis and development of measures
- Drafting of an expert opinion for the EIA
- Negotiations with public authorities
- Hydrogeological support during the construction phase
- Groundwater monitoring
- Reporting