Power Plant Rothleiten Previous


  • 150726_Baustelle_KW_Rothleiten_15.JPG
  • 150513_Baustelle_KW_Rothleiten_09.JPG
  • Kalk_anstehend_1.JPG
  • KB7_02_Bohranlage.JPG
  • Bohrkern_KWR-UW_KB_01-10_10m_12m.jpg
  • 141112_Baustelle_KW_Rothleiten_02.JPG
  • KW_Rothleiten_Besichtigung_37.JPG
  • KW_Rothleiten_Besichtigung_26.JPG
Client: Frohnleiten Energie- und Liegenschaftsverwaltungs-GmbH
Location: Frohnleiten (Styria)
Time period: 2006 - on-going

Project:

Drafting of the technical contribution on hydrogeology for the environmental impact assessment statement with a numerical model; qualitative and quantitative groundwater monitoring.

Services:

  • Collection of data and research.
  • Geological and hydrogeological mapping and location of local wells.
  • Sinking of wells and setting up of gauging stations; setting up of a gauge network.
  • Creation of a geological and hydrogeological model.
  • Investigation of groundwater quality.
  • Calibration of a stationary numerical groundwater model for various hydrological situations.
  • Model calculations and prognoses of construction and operation phases.
  • Impact analysis and development of appropriate measures.
  • EIA report on groundwater.
  • Groundwater monitoring using pressure probes and data loggers.