River Mur Bridge Prettachfeld/Hinterberg Previous Next
Client:
Immorent-Süd Gesellschaft m.b.H.
Location:
Leoben (Styria)
Time period:
2004 - 2005
Project:
In order to connect the industrial area in Prettachfeld with the district Hinterberg, an approx. 500-metre long access road was built. The project included a 100-metre long bridge over the river Mur, the construction of which required civil engineering works. To stabilise the well field of the nearby Göss brewery a hydrogeological groundwater monitoring programme was implemented.
Services:
- Management and analysis of the qualitative and quantitative groundwater monitoring programme
- Building site visits
- Hydrogeological expert opinion