Client: Betriebsgesellschaft des Marktes Altdorf mbH
Location: Altdorf (Lower Bavaria, administrative district Landshut)
Time period: 2003 - on-going

Project:

In 2008, the deep well Altdorf Thermal 1 was drilled for the project 'Altdorf' (depth 611 m, T 65 °C). In 2012, the well Altdorf Thermal 2 was deepened for the completion of the doublet (depth 780 m, T 64 °C).

Objective: Geothermal energy use for heat supply in the municipal area Altdorf.

Services:

  • Examination of the geological feasibility
  • Drafting of geological/technical design and construction documentation
  • Administration of approval processes during the exploration phase (obtaining and renewing of licence area, permits required by water law, operating plan approval under mining law)
  • Administration of tendering and contract award procedure and drafting of a drilling contract
  • Construction and project supervision of the drilling
  • Documentation of results

Result:

88 l/s with 1 m subsidence!