Ried im Innkreis Previous Next
Project:
Drilling of a deep well (depth: 2592 m) for the expansion of the existing geothermal Doublet Mehrnbach (Drillings Mehrnbach Th 1 and Th 2).
Exploitation of thermal waters (110 °C) from jointed Carbonates of the Upper Jurassic (Malm) in the Upper Austrian Molasse Basin and use for district heat supply.
The district heating network with a length of 35.3 km spans currently nearly the complete urban area of Ried im Innkreis. In 2018, 2524 connected sites (Flats, family homes and commercial sites) are supplied with 50.6 GWh heat.
Services: Construction of the deep well Mehrnbach Th 3
- Preliminary project work.
- Development of a geological structural model.
- Preparation of a numerical groundwater model.
- Geological-technical planning of the wells.
- Preparation of the documents for the approval processes according to water legislation.
- Consulting the client with tendering.
- Project management and geological/technical support of the drilling, testing and tests regarding water management.
- On-going project support.