Simbach-Braunau (D, A) Previous


  • Rig_ges5.jpg
  • Infotafeln.jpg
  • Kopie von Festplatz1.jpg
  • PIC00029.jpg
  • PIC00018.jpg
  • Meissel3.jpg
  • Auslaufversuch2.jpg
Client: GSB - Geothermie-Fördergesellschaft Simbach-Braunau GmbH
Location: Simbach am Inn (Bavaria) and Braunau am Inn (Upper Austria)
Time period: 1997 - on-going

Project:

Drilling of two deep wells for geothermal use in the form of a doublet.
Using the geothermal doublet for district heating supply of the cities Simbach am Inn and Braunau am Inn.
The two deep wells are drilled within a distance of 15,5 m from one drill site in Simbach am Inn.
S-B Th 1 as a vertical drilling, S-B Th 2 as a deviated drilling that stretches under the river Inn as far as Austria.

Services:

Construction of the doublet Simbach-Braunau (exploration phase):

  • Preliminary project management
  • Geological feasibility study
  • Drafting of documents for the application for EU funding
  • Geological/technical design documentation and detailed planning for the deep drillings
  • Administration of the EU-wide tendering procedure
  • Administration of approval processes (water and mining law) in Bavaria and Austria
  • Construction management, support and documentation
  • Planning and tendering for the establishment of continuous operation
  • Acceptance and supervision of start-up operations
  • Hydrogeological monitoring

Continuous operation Simbach-Braunau (production phase):

  • Preparation of applications for the operating permit in Bavaria and Upper Austria (e.g.: licence area "Aenus", water and mining law permits, main operating plan)
  • Drafting of annual reports (for water authority)
  • Drafting of main operating plans
  • Numerical modelling of the geothermal doublet operation (e.g.: expert opinion on deep heat mining)