Slag heap Judenburg Previous


  • Blick von BH auf Areal 1.jpg
  • Haldenanschnitt bei Baustelle südlich Wuppermann.jpg
Client: Liegenschaftsverwaltung GmbH
Location: Judenburg
Time period: 1994 - on-going

Project:

Geological/hydrogeological exploration; Hydrochemical and hydrogeological monitoring; Construction supervision according to water law.

Activities:

  • Project planning, determination of a drill site and geologi-cal/hydrogeological support of exploration drillings
  • Planning of the hydrochemical monitoring programme
  • Drafting of interim reports
  • Preparation of a hydrogeological and hydrochemical final report on the containment project slag-heap Judenburg with suggestions for a future monitoring programme, provided that the contamination can be classified as safe in the contaminated land register
    - Research of historical documents and summary all previously gathered geological and hydrogeological data
    - Presentation in geological profiles
    - Preparation of a map of aquicludes and of groundwater contour maps
    - Compiling of maps
    - Summary, evaluation and interpretation of groundwater monitorings, chemical investigations and eluate analyses
    - Calculation of infiltration balances
    - Presentation of the afteruse of the slagheap surface and presentation of subsurface installations in relevant sections
    - Suggestions for a future monitoring programme
  • Drafting of reports (required every other year) on the compliance with restrictions assigned by authorities
  • Construction supervision according to water law
  • Project management