Straubing (D) (2) Previous


  • fraesgarnitur.jpg
  • PIC00001.jpg
  • PIC00004.jpg
  • PIC00010.jpg
Client: Straubing GmbH
Location: Straubing, Lower Bavaria
Time period: 1996 - 2007

Project:

Implementation of the first operative doublet in the Southern German Molasse basin by extending the well “Straubing Therme II”, which was drilled in 1992, with the deviated well “Straubing Therme IIa”.

Development of carbonate rock of the Upper Jurassic by means of the drilling “Straubing Therme II”, with a permeability suitable for the reinjection of thermally processed thermal water.

Activities:

  • Analysis of aerial images
  • Planning, tendering and submission
  • Geological/technical drilling support
  • Application for permits for the operation of the doublet Straubing
  • Follow-up work