Low-Bin Previous Next
Client:
European Commission; Consortium of 9 partners from 8 countries
Location:
Simbach am Inn, Austrian-Bavarian border
Time period:
2006 - 2009
Project:
Development and construction of a low-temperature ORC facility for electricity generation at the geothermal doublet Simbach-Braunau.
Activities:
- Project management: participation in project meetings with partners; drafting of annual technical and financial reports for EU authorities
- Compiling of a data basis (incl. drilling and operating data of the doublet Simbach-Braunau; energy prices in Bavaria and Austria) required for the development of the ORC-facility prototype
- Preparation of the project site: planning and monitoring of the cooling water well construction (drainage) for the ORC-facility
- Application for permits required by water law for the construction and operation of the cooling water
- Organisation of and participation in the concluding workshop