Gleisdorf, Water supply Previous Next
Client:
Stadtwerke Gleisdorf Ges.m.b.H.
Location:
Gleisdorf
Time period:
1994 - 2004
Project:
The Stadtwerke Gleisdorf Ges.m.b.H. (public utility company) provides the municipality of Gleisdorf with drinking water. For the safeguarding and extension of the water supply of the municipality four drinking water wells were constructed between 1993 and 2004:
- Mühlhausen well (depth: 175 m, drilled in 1993)
- Feldgassen well (depth: 177 m, drilled in 1996)
- Raabweg well 3 (depth: 90 m, drilled in 2003/2004) = replacement for Raabweg well 1
- Raabweg well 4 (depth: 45 m, drilled in 2004) = replacement for Raabweg well 2
Services:
- Geological/hydrogeological and technical planning of the wells
- Application for permits required by water authority
- Planning and implementation of monitoring measures on private artesian wells; evaluation of results
- Administration of the open tendering procedure for the drillings; determination of best value and drafting of drilling contracts
- Geological and technical drilling support
- Geological/hydrogeological evaluation of drillings and tests related to water resource management
- Drafting of final documentation for the application for operating permits