Mitterdorf Previous Next
Client:
Private person
Location:
Mitterdorf/Raab
Time period:
2007
Project:
Direction and evaluation of a pumping test and drafting of a hydrogeological expert opinion.
Activities:
- Support of the pumping test, provision of a pressure probe/data logger, dip meter and conductivity meter for the pumping test
- Analysis of the data obtained in the pumping test
- Drafting of a hydrogeological expert opinion to prove the productivity of the well to authorities