Bad Tatzmannsdorf Previous


  • Thermenrundflug057_BadTatzmannsdorf.JPG
  • PIC00008.jpg
  • PIC00001.jpg
  • DSCN9693.JPG
  • Anlage_Koller.JPG
  • Bautafel.JPG
Client: Kurbad Bad Tatzmannsdorf AG
Location: Bad Tatzmannsdorf
Time period: 1988 - 2008

Project:

Development of thermal water and safeguarding of thermal water production for use in the thermal baths and hotels of Kurbad Tatzmannsdorf AG by drilling three thermal boreholes.

Services:

  • Carrying out of geological detailed investigations
  • Planning and geological/hydrogeological evaluation of reflection seismic investigations
  • Conducting of geological feasibility studies
  • Determining of drill sites
  • Planning of approval procedures for permits required by water and mining law
  • Geological/technical design and construction documentation
  • Carrying out of EU-wide tendering
  • Preparation of and participation in the award procedure
  • Construction management
  • Geological/hydrogeological evaluation of drilling and testing results
  • Preparation of final documentation to obtain permits for continuous abstraction

Link: Therme Bad Tatzmannsdorf